Cost Engineering Consulting

Consulting Services

  • Construccion Estimates
  • Pre-Estimates
  • Quantity Surveying
  • Ad-hoc Data Bases
  • Replacement Value for appraisal
  • Cost Opinion and Auditing
  • Cost Re-Engineering
  • Job Cost Control conciliation

Varela InC and Intercost Estimating Projects:

  • Call Center Santander, Querétaro (Estudio Lamela).
  • Campeche Playa, Golf, Marina & SPA Resort (M+A, Mall, Hogalia)
  • 900 Condo-Resorts en Cruz de Huanacastle, Puebla, Cancún y Rosarito (ICON Group)
  • Theatre-Opera and Arts School at Poliforum Cultural, León, Gto. (Augusto Quijano Ars)
  • Conjunto Nubia – K-SA de 163 apartment Social interest
  • Post Wilma hurricane Reconstruction Costs: 8 Palace Hotels on the Caribbean
  • Rincón del Bosque Condos (Hasbani)
  • Nuevo Senate Building (Banobras, Muñoz Arqs)
  • Teatro Queretaro (Teodoro González de León – starting)

consultoria en costos 

Innovations

English-spanish Construction Pre-Estimates

Construction Cost Engineering services innovations that offers our Company, have allowed to elaborate Pre-Estimates with descriptions optionally in Spanish or English language, applying the Assembly/Systems Method, specially for English speaking investors projects whom they have asked for initial Estimates for feasibility analysis or when the first drafts are being taken and a reasonably sustained and reliable Pre-Estimates are required. This service already has been used successfully in hotel and residential projects.

Construction Costs Reengineering

The purpose of this service that Varela Inc offers, is to establish criteria,methods, standards and procedures for Cost Engineering that construction organizations and developers, applicable internal and externally (Contractors and bidders), intending standardizing reports, codes and data for construction Estimates.

 

Varela’s Cost Engineering definition is “The art of applying scientific and empiric knowledge for making the more realistic conjectures and Estimate the amount of construction costs and its control during job”; for Reengineering, we understand a radical process redesign of an organization.

 

We prepare a regulation document for:

  • Materials, labor, services
  • Intermediate or Auxiliary concepts (mortar, forming)
  • Equipment hourly costs
  • Concepts of work (line items)
  • Bill of quantities
  • Pre-Estimates
  • Job cost control

Copyright © Varela Ingeniería de Costos S. A. de C.V. 2010